|
|
Harvard University
Thayer Hall
Cambridge, Massachusetts |
Square Footage: 53,000
Construction Cost: $12 million |
Thayer Hall, a freshman dormitory located in Harvard Yard, consisted of suites that divided the building into three entities. FA+A completed the reconfiguration, modernization and restoration of the building, to enable and promote communication among the residents as well as full accessibility into and within the building. To meet changing student needs and to achieve ADA compliance, the building was extensively reconfigured to a traditional corridor system. Previously unused attic space was converted for 24 additional student rooms. Built in 1869, Thayer Hall, now houses 65 suites for freshmen.
|
|